December 21st - Final Details
The A-Frame bars received a second coat of olive drab and were once again left to dry. The winch was mounted onto the floor frame and the handle painted with 'UP' and an arrow to avoid confussion due to the gearing, as the handle rotates the opposite direction to the reel.
The reel was fully unwound too, as the inner crimped end was pointing into the reel and the cable was getting snagged on it wound onto the core of the reel. To solve this, the inner crimped end was cable tied to the centre bar of the reel and taped over with duct tape to give a more even surface for the cable to wind onto. Approximately half of the 20 metre cable was carefully wound onto the reel and this was then given a couple of wrappings of duct tape. I don't need the full length of the cable anyway and this keeps at least half the reel from unravelling if there's no tension on the wire. The rest of the wire was then wound onto the reel, forming a nice even coil side to side as it was wound into place.
I'll give it all a couple of days for the paint to harden, then the frame can be fitted into the floor of the truck. With that done, I can work out where the wooden pads need to go on the A-Frame bars which I think is the final job.
There's rain forecast for the next few days, but looking ahead, the 28th looks dry, so I may try to take the Dodge and Jeep out for a short drive and photoshoot with the crane.
